Wendi is still out of town and nick is hard at work. Since the big sheets of green board were already installed, all that is left are the small framing details. Around the window, the door and electrical outlets made for a long day of detailed measuring, cutting and lots of shaving. By the end of the day, nick finished installing all the greenboard required for this project.


No comments:
Post a Comment