Thursday, February 14, 2008

DAY 5, PLUMBING & ELECTRIC ROUGH IN

We found a plumber and lucky for us, he also is an electrician. Randy came in and did the plumbing rough in for us. He installed the ceiling light and fan over the shower, moved the drain to the center of the shower, and raised the shower head up so that Nick doesn't have to duck when showering! Randy also replaced a good portion of our lead pipes with PVC. Our toilet flange was also not up to code, so Randy updated that. As far as the electric goes, we had randy instal the casing for a new outlet near the vanity and also wire the light switch for dual controls. Thanks Randy! (now we just need someone to do the shower liner for us)